CLASSIFICATION: ABSOLUTE
DOCUMENT REF: TH-∅-001

THRESHOLD

Arrival is the only paradox.

TOPOLOGY
Stabilized Wormhole
INTERIOR PHYSICS
Standard Model
MAINTENANCE SYSTEM
Pi Engine v∞
SCROLL
SECTION 01
CLASSIFIED

About the Facility

THRESHOLD ∅ is a research installation occupying the interior volume of a topologically stabilized Einstein-Rosen bridge. The facility does not exist at any fixed coordinate in conventional spacetime. Its location is defined not by position, but by the continuous maintenance of a specific curvature condition.

Entry into the facility produces a retrograde amnesia specific to the transit event. Personnel arrive with no memory of the crossing. This is not a malfunction. This is the expected consequence of passing through a region where causal ordering is undefined. The paradox of entry is structural, not incidental.

Once inside, physics behaves normally. The Standard Model holds. Time flows forward. Gravity operates at 1g in designated habitation zones. The interior is, by every measurable metric, a stable environment. The instability exists only at the boundary — and the boundary is maintained.

Spacetime curvature model

FIG. 1A — SPACETIME CURVATURE MODEL (ISOMETRIC VIEW)

FACILITY PARAMETERS — CURRENT STATUS
Topology ClassEinstein-Rosen (Stabilized)
Interior Volume~4.2 × 10⁶ m³
Curvature MaintenancePi Engine (Active)
Entry AmnesiaConfirmed / Expected
Interior Gravity1.00g (Habitation Zones)
Temporal FlowForward / Standard
Collapse RiskConditional on Core
SECTION 02
RESTRICTED ACCESS

The Core

Pi Engine spiral

The Pi Engine

At the geometric center of the facility operates the Pi Engine — a computational system of unknown origin that continuously calculates the decimal expansion of π. The calculation has no terminal condition. It does not converge. It does not stop.

The relationship between the Engine's output and the wormhole's stability is not fully understood. What is understood is empirical: when the calculation proceeds, the curvature holds. The interior remains accessible. Reality, as experienced by personnel within the facility, continues.

If the calculation were to cease — for any reason, at any point — the curvature condition would fail. The wormhole would collapse. The interior volume would compress to a singularity. This outcome is irreversible.

PI ENGINE — LIVE COMPUTATION STATUS
2,914
DIGITS COMPUTED THIS SESSION
CALCULATION ACTIVE — CURVATURE STABLE
FAILURE CONDITION

Cessation of calculation → curvature failure → wormhole collapse → singularity formation. No evacuation protocol exists.

SECTION 03
FACILITY MAP

Research Zones

ZONE A
LEVEL 3 ACCESS

Gravity Rooms

Isolated chambers where gravitational field strength is independently adjustable from 0.001g to 4.2g. Used for materials testing, biological adaptation studies, and structural stress analysis under non-standard gravitational conditions.

Gravity Range0.001g — 4.200g
Chamber Count14 Active
Field Precision±0.0001g
ZONE B
LEVEL 4 ACCESS

Time Rooms

Chambers where local temporal flow rate is modulated relative to facility standard time. Temporal dilation ratios are maintained via controlled metric perturbation. External observers experience no anomaly. Internal observers experience compressed or extended duration.

Dilation Range0.1× — 8.0×
Chamber Count6 Active
Sync Drift<0.003s / 24h
ZONE C
LEVEL 5 ACCESS

Consciousness Rooms

Experimental chambers designed to study the relationship between observer consciousness and quantum measurement outcomes. Access is restricted. Results of ongoing studies are not published in standard facility documentation.

StatusActive / Restricted
Chamber Count3 (Classified)
Observer Limit1 per session
ZONE D
LEVEL 2 ACCESS

Planetary Simulation

Large-volume chambers capable of simulating the atmospheric, gravitational, and electromagnetic conditions of any catalogued planetary body. Used for mission preparation, xenobiological research, and long-duration habitability studies.

Volume~180,000 m³ each
Chamber Count4 Active
Atmosphere Fidelity99.7%
SECTION 04
MANDATORY

Protocol

RULE 01

Do Not Interrupt the Calculation.

RULE 02

The Core Is Not Approached.

RULE 03

Arrival Is Not Discussed.

These protocols are not advisory. They are structural. Deviation from any of the above does not constitute a violation of policy. It constitutes a threat to the continued existence of the facility and all personnel within it.